Search
Wish list
Region
Region (hr)
Products
Company
Focus on
Contact
de  en  pl  fr  hr  nl  hu  it  sv  sl  cn  es

IBERDROLA 275KV „WINDY HILL“ SUBSTATION

Stop water leaking into the main station

IBERDROLA 275KV „WINDY HILL“ SUBSTATION
Glasgow
IBERDROLA 275KV 
„WINDY HILL“ SUBSTATION 

Project information

Stop water leaking into the main substation

Seal cables effectively to prevent the ingress of water at the point of cable entry.

Leaking mastic sealing solution 

Leaking mastic sealing solution 

Entry point with test installation of 2 seals 

Test installation of 2 seals 

Installation of HRD 188-1G-1/97 

Installation of HRD 188-1G-1/97 

Finished installation 

SOLUTIONS BY HAUFF-TECHNIK
 Specification 
Seal cables effectively to prevent the ingress of water at the point of cable entry 
Requirement 
Split press seal with a sealing width of 30mm to prevent the ingress of water 
Products used 
HRD 188-1G-1/97 
HRD 103-1G-1/32